Command Palette

Search for a command to run...

FreePromoDeal
All deals

Shop by Category

ElectronicsMobilesFashionHome & KitchenBooksSports & FitnessBeauty & HealthToys & GamesAll categories →

Shop by Store

AmazonFlipkartAll stores →

Guides & Editorial

Buying guidesThis week's roundupSale calendarAll articles →
Sign in
FPD
Home›Deals›Computers›EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03)
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03)-66%
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03)
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03) 2
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03) 3
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03) 4
EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03) 5
AmazonHot Deal

EVM 600Mbps USB WiFi Adapter | Dual Band 2.4GHz 5GHz 802.11ac | High Gain Antenna | Wireless Dongle for PC Laptop | Windows & Mac Compatible | 1 Year Warranty (EVM-USBD-03)

₹679₹1,999

You save ₹1,320

⚡ Lowest in 30 days

✓ Verified 3 Jun

S

Deal Score

Lowest price ever

Buy at Amazon — ₹679

↗ Opens on Amazon — verify price before checkoutAs an Amazon Associate, FreePromoDeal earns from qualifying purchases.

Share:WhatsAppTelegramX

Editor's note

The headline spec here is 600Mbps Dual Band WiFi – 2.4GHz & 5GHz Simultaneous Support: Switch between the 2.4GHz band (long range, up…. 66% below MRP at ₹679; you're saving ₹1,320, which is exceptional for this category. A strong buy at this price — deals this deep don't last long.

About this deal

600Mbps Dual Band WiFi – 2.4GHz & 5GHz Simultaneous Support: Switch between the 2.4GHz band (long range, up to 300Mbps) and the faster 5GHz band (up to 300Mbps) for reduced interference, lower latency, and optimized wireless performance.. 802.11ac Technology – Next-Gen Wireless Standard: 802.11ac (WiFi 5) compliance delivers faster speeds and improved performance in congested WiFi environments compared to older 802.11n adapters.. High-Gain Antenna – Extended Range & Stronger Signal: The built-in high-gain antenna boosts signal reception in challenging environments with thick walls, multiple floors, or long distances from the router.. Universal Compatibility – Works with All Routers & OS: Supports Windows 11/10/8/7 and macOS with plug-and-play driver installation. Compatible with all 802.11 a/b/g/n/ac dual-band routers and access points.. Reliable Wireless Upgrade – 1 Year EVM Warranty: Ideal for desktops and laptops needing dual-band WiFi without internal hardware changes. Backed by EVM's 1-Year manufacturer warranty.

Key features

  • ✓600Mbps Dual Band WiFi – 2.4GHz & 5GHz Simultaneous Support: Switch between the 2.4GHz band (long range, up to 300Mbps) and the faster 5GHz band (up to 300Mbps) for reduced interference, lower latency, and optimized wireless performance.
  • ✓802.11ac Technology – Next-Gen Wireless Standard: 802.11ac (WiFi 5) compliance delivers faster speeds and improved performance in congested WiFi environments compared to older 802.11n adapters.
  • ✓High-Gain Antenna – Extended Range & Stronger Signal: The built-in high-gain antenna boosts signal reception in challenging environments with thick walls, multiple floors, or long distances from the router.
  • ✓Universal Compatibility – Works with All Routers & OS: Supports Windows 11/10/8/7 and macOS with plug-and-play driver installation. Compatible with all 802.11 a/b/g/n/ac dual-band routers and access points.
  • ✓Reliable Wireless Upgrade – 1 Year EVM Warranty: Ideal for desktops and laptops needing dual-band WiFi without internal hardware changes. Backed by EVM's 1-Year manufacturer warranty.

Community (0)

0/1000

Loading…

Related deals

GALAXAR GLX I5 3470-16GB-256GBNVME GAMING Intel Core i5-3470 Processor (16 GB RAM/Intel® HD Graphics 2500 Graphics/500 GB Hard Disk/256 GB SSD Capacity/Windows 11 Pro/1 GB Graphics Memory) Gaming Towe-46%
Flipkart

GALAXAR GLX I5 3470-16GB-256GBNVME GAMING Intel Core i5-3470 Processor (16 GB RAM/Intel® HD Graphics 2500 Graphics/500 GB Hard Disk/256 GB SSD Capacity/Windows 11 Pro/1 GB Graphics Memory) Gaming Towe

₹14,882₹27,499
Enter TANGSUNG2 i5-2nd (8 GB RAM/Intel® HD Graphics 2000 Graphics/500 GB Hard Disk/128 GB SSD Capacity/Windows 10 (64-bit)) Gaming Tower with MS Office-47%
Flipkart

Enter TANGSUNG2 i5-2nd (8 GB RAM/Intel® HD Graphics 2000 Graphics/500 GB Hard Disk/128 GB SSD Capacity/Windows 10 (64-bit)) Gaming Tower with MS Office

₹12,500₹23,499
Rasvesh Iron Kitchen Trolley with Wheels, Kitchen Organizer Items and Storage Solutions for Squre Kitchen Organizer and Kitchen Accessories Items (Black,Layer 3)-79%
Amazon

Rasvesh Iron Kitchen Trolley with Wheels, Kitchen Organizer Items and Storage Solutions for Squre Kitchen Organizer and Kitchen Accessories Items (Black,Layer 3)

₹1,699₹7,999
One94Store Hello Digital Alarm Clock with LED Display & Night Light | Cute Cartoon Design, Snooze, Timer & Temperature | Bedside Clock for Kids, Bedroom & Home-80%
Amazon

One94Store Hello Digital Alarm Clock with LED Display & Night Light | Cute Cartoon Design, Snooze, Timer & Temperature | Bedside Clock for Kids, Bedroom & Home

₹399₹1,999

Read our Computers buying guide →

FreePromoDeal earns an affiliate commission when you buy through links on this page. Prices are provided by the merchant and may change.

Discover

  • All deals
  • Categories
  • Stores
  • This week
  • Saved deals

Read

  • Buying guides
  • Editor's notes
  • Deal roundups

Company

  • About
  • Contact
  • Privacy
  • Terms

Subscribe

5 hand-picked deals every morning at 9 AM IST.

Join Telegram
FreePromoDeal·Curated daily deals from Amazon, Flipkart, Meesho and more. Verified by editors before they go live.

As an Amazon Associate, FreePromoDeal earns from qualifying purchases. Prices are subject to change.